Working inside today due to the weather, it was blowing well across the marina so I decided it was best not to try and remove the sheet over the wheelhouse. Completed the ducting that will carry the 12V cables across the cabin side of the engine bulkhead.
So this,
now looks like this.
The 240V cable over the top will be installed in it’s own flexible conduit run.
Started opening plugs and switches ready for the wiring replacement and am still amazed at the standard of wiring even though I should be used to it by now.
Next job is to disconnect the mains supply and route it all through the new hole in the bulkhead to keep it separate from the 12V. Decided things were too dark to work in the engine bay without lighting so lifted a bit of the oak flooring to see what it was like underneath.
Yep it has definitely warped. Spot the broken screws.