Sunday, 28 June 2009

Work in progress

Back down to Great Haywood yesterday to meet up with Ben and it's definitely work in progress. So much has developed since the last visit. I was amazed to see that the oven is already in and the wenge wood work top has been fitted, just needs the cutouts for the hob and Belfast sink. Ben tells us that it is a horrendously hard wood and it sounds like it's great for blunting router bits. Eee but it looks grand lad. Talked over the lounge area layout, and, because we've lost space by having a longer wheelhouse have decided to abandon the stove idea to make more room and are looking for a beefier heating system to compensate.
With the cover off the roof opening for the skylight (Surely it's too big to call it a dog box) the interior looks realy light and airy. This is the view from the bathroom door looking towards the wheelhouse. Ben says he will be building in a curved corner unit by the steps down which will house the microwave amongst other things.
Even on Saturday afternoon Ben and Mick were beavering away to keep up with work. It sounds like thery have plenty of jobs in the pipeline, which has got to be a good sign in these times. The stand for the wash basin in the bathroom is being made to match the cupboard in the lounge and its a marvel to see the work that goes into each piece.

In the bedroom the bed base is in covering the bow thruster and poo tank, ( So if it leaks we'll be the first to know about it) but there's still room for drawers underneath.

Done it again - so busy drooling over the interior forgot to take a picture of the wheelhouse hinges. Ah well there's always next time. Finished of the day with a cuppa at the cafe at Haywood lock and did a bit of gongoozling. Dream on - back to earth with a bump and off to work for a 12 hr night shift.

Wednesday, 17 June 2009

The shape of things to come.

Firstly a couple of pictures of the launch from Ben and Kelly which I promised. Our only regret was that we weren't there to see it for ourselves. Three weeks ago and the time has just flown.
Went down to the boat on my own today as Karen was at work to fit the wheelhouse hinges cum handrails which Mick at TR Fabrications in Nottingham had made in stainless steel. Spent the day filing out the holes in the lugs to try and raise the mounts as they were a bit lower than intended. Now they are bolted in place and work as anticipated but the proof of the pudding will be when the wheelhouse sides are fitted to them. I've thoroughly enjoyed today being down at the boat with Ben and Mick but I realise that getting the boat fitted out professionally was a good move. Forgot to take any hinge photo's because I was so blown away by what Ben and Mick had been up to down in the interior. Amazing how people disappear when the camera comes out.

This will be the breakfast bar end of the kitchen area,
oven and hob will be fitted on the other side.

Bens taken our request for no low open shelves that dog
tails can clear to heart and come up with this splendid item.
Can't wait for it to be finished, when the woodwork is oiled/waxed/varnished or whatever so the grain of the wood can be seen at its best. Probably be next month before we can get down again but got to earn a crust to pay the bills.

Saturday, 30 May 2009

We are afloat

Well this is it folks on the water already. No photo's of the boat being craned in as we were both at work on the day but Ben has a pile of pics of the event and will forward them to us. I'll post a few for posterity when they arrive. Here she is already got the foam insulation and battening fitted and preparations being made for first fix wiring. Ben is certainly cracking on. Glitches found to date is the 4 blade prop came with a different taper to the shaft but this should be rectified in a week or two and the most confusing one is there doesn't appear to be a filler opening on the fuel tank. Ah well life would be too quiet without a few hiccups along the way.
She looks good on the water where she belongs, but still lots of work to do. Apparently there is hardly any ballast on board but with the 15mm base plate she nearly draws 24" already, which is good as I'm looking to reduce the air draught to 5'10" if possible.
Popped down to the moorings at Pillings Lock Marina and see that the power hookups have now been completed to the pontoons at our end and everything is looking good. Stopped for a quick cuppa and cake in the cafe.

Wednesday, 27 May 2009

Busy week-end

Down at Bluewater again on Friday for one last look at the hull before it leaves Bluewater. Couldn't see much as it's in the process of being shot blasted prior to being primed and having 2 pack black on lower half.
Managed to get up and take a few measurements for the wheelhouse hinges but rushed it and still need more, but the next time we see this beastie it will be down with Ben at Great Haywood. Thanks again to all the people at Bluewater for time and patience in dealing with this novice and providing such a shapely hull.

Following day, Saturday down at Crick for the show, trying to keep spending urges in check. (some hope). Met up with Ben and Kelly on their stand and admiring the display units and wondering how best to fit them into our build. Lots to see and do, got plenty of rope,( Can't ever have enough of that) mooring spikes with covers and all manner of sundry items. Most important of all were a pair of lifejackets for the dogs. I doubt if they'll be used very often but it will be peace of mind for us if we venture out onto some of the larger rivers or tidal reaches. Not too sure at first but the pups soon go used to them.

Back to work on Sunday and the rest of the bank holiday -- such is life, but pays the bills, roll on retirement!

Tuesday, 19 May 2009

Quick visit

Back down to Bluewater again yesterday to meet up with David and Ben as there seemed to be a problem developing over delivery dates and work to be done, but on arrival I find all problems have been sorted and delivery date has been moved back to next Tuesday after the bank holiday. My fault I suppose wanting this big fancy wheelhouse has made a lot more work than expected. Ben appreciates the extra work and has ageed the later delivery date. David is putting as many people on the job as he can fit round the wheelhouse, and I'm still going to get a cracking boat that hasn't been spoilt by rushing it. Thanks chaps!

Work on the forward hatch.
Work on the wheelhouse seats


Two views of the extra large gas locker which will take a dustbin as well as two bottles and collapsable bottle cart. Side hatch on the bottom shot looks complete. There certainly has been some work going on since last Friday.

Rogues gallery - Ben and David all smiles after problems sorted. Perfectionists hard at work!



Saturday, 16 May 2009

Coming On

Bluewater again yesterday, and there has been more progress. The last photo's taken are on Ben's website from last Friday show main cabin on, but now the wheelhouse is up and the windows and hatches have been cut out. My worries about the wheelhouse sides to take the handrail cum hinge that I have designed are just perfect but no mounting lugs fitted yet so I cant take measurements for the final drawing. Once again I think I've been lucky finding the right man (or should that be person these days) in contacting Mick at TR fabrications in Nottingham who can make the hinges, which will be 5ft long and leave an exposed handrail with either the wheelhouse up or down, in stainless steel.
Still plenty of work to do though, and David at Bluewater thinks he will have to send the handrail mounts away for drilling to 27mm to accept the handrail. Offered to do it at my workshop at home as I have facilities here if he could provide the steel, but he reckoned he'd got it covered. Even so looking at the work still to be done considering it was Friday afternoon and there was still plenty of seam welding to be done, dog box to cut out, bollards and gas locker to make plus the hatch frames and rudder to fit before it can be shot blasted and painted. I think the delivery date of next Wednesday is highly optimistic, but at the end of the day I'm not complaining as the care and attention to detail is second to none.
Tried to take a few photo's while we were there but the camera started acting up. B***er.
Karen took some shots on her phone but I cant get them to upload to the computer. Double B***er.

Wednesday, 6 May 2009

Progress


Back down to Bluewater a couple of times over the past few days, mainly to explain what I want doing in the wheelhouse to try and gain a few extra inches of leg room. Unfortunately the idea of being able to turn the wheelhouse dinette into a put me up bed have been knocked on th head owing to the fact that I hadn't taken into account the fact that this nice shapely hull turns in much earlier than the normal narrowboat rear. David at Bluewater is going to taper the wheelhouse to follow the gunnels and then step in for the wheelhouse upperworks. I'm sure he thinks my idea will spoil the lines of this curvy hull. On my own head be it.

Anyway time will tell on that one, back to the build at present, the work continues to move forwards and with the longer wheelhouse the engine bay is going to be huge - perhaps we should take up smuggling! Got a better look at the inside this time and you can see the fuel tanks with weed hatch in between.

The hawse hole has been added to the bow and chain locker installed. Looking from ths angle the bow looks like it was taken from something that fought in the battle of Jutland.

I think I'm starting to get the hang of this blogging lark but still plenty to learn. Thanks for the tip Bill.